T-Ross Brothers Construction completed a large-scale renovation and facility improvement project for Xylem’s manufacturing operations in Watsontown, Pennsylvania, upgrading the company’s main production plant and Bay #1.
The project encompassed approximately 21,600 square feet of active production space and included extensive structural, concrete, masonry, building envelope, lighting, and operational improvements designed to enhance the facility’s durability and long-term performance.
Completing extensive renovations within an active manufacturing environment required careful scheduling, safety planning, and coordination to minimize disruption to Xylem’s ongoing production operations.
The existing facility required significant demolition and structural modifications, including removal of exterior brick and foundation walls, interior framed wall systems, and raised floor areas within Bay #1. The project also required coordination of environmental demolition requirements and repairs to damaged portions of the existing structure.
T-Ross Brothers coordinated demolition, excavation, and construction of new foundations, reinforced concrete floor systems, masonry frost walls, and structural framing to support the updated manufacturing environment.
Significant building envelope improvements included new standing seam roofing, insulated metal wall panels, structural girts, and additional insulation systems designed to improve durability and building performance.
Operational and safety improvements included new overhead and hollow metal doors, fencing, LED lighting, emergency lighting, and exterior wall packs. Structural repairs were also completed and carefully integrated with the new construction throughout the existing facility.
Upon completion:
Approximately 21,600 square feet of manufacturing space renovated and improved
Extensive demolition and structural modifications completed
New foundations and reinforced concrete floor systems
New masonry frost walls and structural framing
New standing seam roofing system
Insulated metal wall panels and additional insulation
Structural repairs to damaged portions of the existing facility
New overhead and hollow metal doors
New fencing and operational improvements
Upgraded LED lighting throughout production areas
New emergency lighting and exterior wall packs
Building envelope improvements designed for increased durability and performance
New construction integrated with the existing manufacturing facility
Renovations carefully coordinated around active production operations